I had an E-mail this morning with more images from the second day of the Bridging Views of Llangynidr weekend (below).

On the second day, the local community continued to build structures and began to hang them with images of local scenes as well as memories and recollections of the area. There were a lot more young people involved on the Sunday, including a group of girls who must have set some kind of speed record with an enthusiastic construction of the smaller arch in about ten minutes. Supervising the cosntruction was like steering an out-of-control HGVdownhill – only limited control available to direct a huge amount of momentum! Spotting potential problems in the frenzy of activity and trying to correct them with a well timed suggestion was both hugely entertaining and incredibly difficult – a day of managing structural scheme design at work seems simple by comparisson…

Advertisements